A dedicated team is set up for as long as is needed to see the project through to a successful conclusion. Management and project management competences are identified to meet the efficiency and quality objectives specific to the industrial requirement.

For 22 months, 70 of our colleagues from a dozen different professional backgrounds worked 100 meters underground, in a tunnel with a circumference of 27 kilometers. With no spatial landmarks, no system of reference to the surface and with no GPS, they connected the 300 points on the line to the LHC magnets, with an assembly tolerance level, on some components, of 0.2%, in 3 dimensions. Just some of the dramatic statistics that give an idea of the scale of this exceptional project, a veritable industrial program in its size and complexity. 